Click to R or L of image above to preview images:
Pechanga Spa
Pechanga Casino Pool & Spa Project design work was done while Alicia was the Design Director at AD/S. Alicia started design work on the project in February 2017 and the signs were built and installed by AD/S in 2018. The project utilized Moz Designs gradient sheet goods, 3 Form Products, along with fabricated components by AD/S.